- Indian Railway’s 1st cable-stayed bridge.
- Part of USBRL project. In J&K’s Reasi district.
- Connects Katra and Reasi.
- Through tunnels T2 & T3 on the Katra-Banihal section.
- 331 m – height from the riverbed.
- 725 m – bridge’s length.
- The structure is an asymmetrical cable-stayed bridge.
- Balanced by a central pylon – that is 193 m high from its base.
- Supported by 96 cables.
- Total length of these 96 cables – 653 Km.
- Main span – 290 m.
- Total deck width – 15 m.
- Designed train speed – 100 Kmph.
- April 2023 – base construction completed. In 11 months. Track laying work next.